SR

SRI-Klasse

Klasse 35–50 %: Grundlagen vorhanden

Kurz gefasst

  1. 1Central controls and time schedules, little occupancy control, limited reporting. Many existing non-residential buildings are here.
  2. 2Die Bänder sind offiziell (Verordnung 2020/2155, Anhang VIII). Name und Buchstabe sind Hilfsmittel dieser Plattform.

Position in der Klassentabelle

0203550658090100
BandNameBedeutungBuchstabe in Tools
90100 %Vollständig smart-readyAlmost all installations are smartly controlled, integrated and ready to move with the grid.A
8090 %Sehr smartA building with a mature building management system, demand-driven installations and first forms of energy flexibility.B
6580 %SmartThe main installations are controlled per zone and on occupancy.C
5065 %Auf dem WegThere is a building management system and some installations are smartly controlled, but not consistently and not integrated.D
3550 %Grundlagen vorhandenCentral controls and time schedules, little occupancy control, limited reporting.E
2035 %BegrenztManual operation dominates.F
020 %Nicht smart-readyAlmost everything is operated by hand.G

Eine Klasse höher

5065 % · Auf dem Weg: There is a building management system and some installations are smartly controlled, but not consistently and not integrated.

Was das für Sie bedeutet

Eigentümer
Lassen Sie eine Bewertung durchführen, um zu wissen, welche Dienste den Unterschied machen. Die Regelung von Beleuchtung, Lüftung und Heizung ist meist der erste Schritt.
Mieter
Fragen Sie den Eigentümer nach der Bewertung und dem Plan für die nächste Klasse. Es betrifft Ihren Komfort und Ihre Nebenkosten.
Berater
Nutzen Sie die Domänenwerte zur Priorisierung: zuerst die Domänen mit hohem Gewicht und niedriger Bewertung.

Nächster Schritt

Möchten Sie wissen, wo Ihr Gebäude steht?