SR

Classe SRI

Classe 20–35 % : limité

En bref

  1. 1Manual operation dominates. There are thermostats and perhaps a timer, but no coherence. The Czech test-phase average was around this boundary.
  2. 2Les bandes sont officielles (règlement 2020/2155, annexe VIII). Le nom et la lettre sont des aides de cette plateforme.

Position dans le tableau des classes

0203550658090100
BandeNomSignificationLettre dans les outils
90100 %Entièrement smart-readyAlmost all installations are smartly controlled, integrated and ready to move with the grid.A
8090 %Très intelligentA building with a mature building management system, demand-driven installations and first forms of energy flexibility.B
6580 %IntelligentThe main installations are controlled per zone and on occupancy.C
5065 %En progressionThere is a building management system and some installations are smartly controlled, but not consistently and not integrated.D
3550 %Bases présentesCentral controls and time schedules, little occupancy control, limited reporting.E
2035 %LimitéManual operation dominates.F
020 %Non smart-readyAlmost everything is operated by hand.G

Une classe plus haut

3550 % · Bases présentes: Central controls and time schedules, little occupancy control, limited reporting. Many existing non-residential buildings are here.

Ce que cela signifie pour vous

Propriétaire
Faites réaliser une évaluation pour savoir quels services font la différence. La régulation de l'éclairage, de la ventilation et du chauffage est en général la première étape.
Locataire
Demandez au propriétaire le score et le plan pour monter d'une classe. Cela touche votre confort et vos charges.
Conseiller
Utilisez les scores par domaine pour prioriser : d'abord les domaines à forte pondération et faible score.

Étape suivante

Voulez-vous savoir où en est votre bâtiment ?