In short

  1. 1De SRI is vrijwillig. De Europese Commissie besluit uiterlijk 30 juni 2027 over verplichtstelling voor utiliteitsgebouwen boven 290 kW.
  2. 2Gebouwautomatisering (GACS, BACS) is al verplicht boven 290 kW en wordt in 2030 verplicht boven 70 kW.
  3. 3Per land verschilt de stand van zaken: zestien lidstaten hebben een testfase gedaan, Nederland niet.
01

Mijlpalen

  1. 14 October 2020

    Delegated Regulation 2020/2155 and Implementing Regulation 2020/2156

    The European Commission sets out the definition, methodology and technical rules of the SRI.

  2. 1 January 2021

    First national test phases

    Austria, Czechia, Denmark and France start first. Eventually sixteen member states take part.

  3. 8 May 2024

    Recast Energy Performance of Buildings Directive (EPBD IV)

    Directive (EU) 2024/1275. Article 15 keeps the SRI optional but requires the Commission to decide on a mandate.

  4. 31 December 2024

    Building automation mandatory above 290 kW

    Non-residential buildings with heating or cooling systems above 290 kW must have a building automation and control system (Article 13).

  5. 29 May 2026

    EPBD IV transposition deadline

    Member states must have transposed the recast directive into national law.

  6. 30 June 2026

    Commission report on the test phases

    Deadline for the report to Parliament and Council. No publication had been found on 9 September 2026.

  7. 30 June 2027

    Delegated act: mandatory SRI above 290 kW

    Deadline for the Commission to adopt the act making the SRI mandatory for non-residential buildings with HVAC capacity above 290 kW.

  8. 1 July 2027

    Finland: national roll-out of SRI assessments

    Announced for summer 2027 after the 2022 to 2024 test phase.

  9. 31 December 2029

    Building automation mandatory above 70 kW

    The threshold for mandatory building automation drops from 290 to 70 kW.