Tijdlijn
Van de eerste verordening in 2020 tot de verplichte gebouwautomatisering boven 70 kW in 2030.
Last checked on 9 September 2026
In short
- 1De belangrijkste datum is 30 juni 2027: dan moet de Commissie de gedelegeerde handeling aannemen die de SRI verplicht stelt boven 290 kW.
- 2Het rapport over de testfases had uiterlijk 30 juni 2026 moeten verschijnen. Op 9 september 2026 was geen publicatie gevonden.
- 3Gebouwautomatisering is sinds eind 2024 verplicht boven 290 kW en vanaf 2030 boven 70 kW.
14 October 2020
Delegated Regulation 2020/2155 and Implementing Regulation 2020/2156
The European Commission sets out the definition, methodology and technical rules of the SRI.
1 January 2021
First national test phases
Austria, Czechia, Denmark and France start first. Eventually sixteen member states take part.
8 May 2024
Recast Energy Performance of Buildings Directive (EPBD IV)
Directive (EU) 2024/1275. Article 15 keeps the SRI optional but requires the Commission to decide on a mandate.
31 December 2024
29 May 2026
EPBD IV transposition deadline
Member states must have transposed the recast directive into national law.
30 June 2026
Commission report on the test phases
Deadline for the report to Parliament and Council. No publication had been found on 9 September 2026.
30 June 2027
Delegated act: mandatory SRI above 290 kW
Deadline for the Commission to adopt the act making the SRI mandatory for non-residential buildings with HVAC capacity above 290 kW.
1 July 2027
Finland: national roll-out of SRI assessments
Announced for summer 2027 after the 2022 to 2024 test phase.
31 December 2029
Building automation mandatory above 70 kW
The threshold for mandatory building automation drops from 290 to 70 kW.
Next step