SR

Hospital · Heating

Heating in hospital: what the SRI measures

The heating domain looks at how smartly a building controls its heat: per room or centrally, based on occupancy and outdoor temperature, and whether the boiler or heat pump follows demand. Heat storage and fault reporting are part of it too.

In short

  1. 1Control of heat emission, generation, storage and distribution.
  2. 2Weight of this domain for this building type: heavy.
  3. 3If everything in this domain is at level 0, the domain contributes nothing. At the highest level for all services, the indicative total score for this building type rises by about 28 percentage points (from 24 to 52 percent, with all other domains at level 1).

Weight of this domain for this building type

heavy

Which services count

ServiceLowest levelHighest levelAdvice
Heat emission control
H-1a · A · 5 levels
No automatic controlIndividual room control with communication and occupancy detectionhighest level
Emission control for TABS (heating mode)
H-1b · 4 levels
No automatic controlAdvanced central automatic control with intermittent operation and/or room temperature feedback control
Storage and shifting of thermal energy
H-1c · A · 3 levels
NoneHW storage vessels controlled based on external signals (from BACS or grid)highest level
Control of distribution pumps in networks
H-1d · 5 levels
No automatic controlVariable speed pump control (external demand signal)
Thermal Energy Storage (TES) for building heating (excluding TABS)
H-1f · 4 levels
Continuous storage operationHeat storage capable of flexible control through grid signals (e.g. DSM)
Heat generator control (all except heat pumps)
H-2a · A · 3 levels
Constant temperature controlVariable temperature control depending on the load (e.g. depending on supply water temperature set point)highest level
Heat generator control (for heat pumps)
H-2b · A · 4 levels
On/Off-control of heat generatorVariable control of heat generator capacity depending on the load AND external signals from gridhighest level
Sequencing in case of different heat generators
H-2d · 5 levels
Priorities only based on running timeControl according to dynamic priority list (based on current AND predicted load, energy efficiency, carbon emissions, capacity of generators AND external signals from grid)
Report information regarding heating system performance
H-3 · A · 5 levels
NoneCentral or remote reporting of performance evaluation including forecasting and/or benchmarking; also including predictive management and fault detectionhighest level
Flexibility and grid interaction
H-4 · 5 levels
No automatic controlOptimized control of heating system based on local predictions and grid signals (e.g. through model predictive control)

Worked example

If everything in this domain is at level 0, the domain contributes nothing. At the highest level for all services, the indicative total score for this building type rises by about 28 percentage points (from 24 to 52 percent, with all other domains at level 1).

What this means for you

Owner
When replacing or renovating in this domain, include the controls right away. It weighs heavily for this building type.
Tenant
Control of heat emission, generation, storage and distribution.
Advisor
10 services in this domain, 5 of which in Method A. Advice for this building type: highest level.

Next step

Want to know where your building stands?