Smart-ready service E-5 · Electricity
Control of combined heat and power plant (CHP)
In short
- 1This service has 3 levels, from manual to fully automatic.
- 2CHP control based on scheduled runtime management and/or current heat energy demand → CHP runtime control influenced by the fluctuating availability of RES and grid signals; dynamic charging and runtime control to optimise self-consumption of renewables.
- 3This service is only part of the full Method B.
The levels
Level 0
CHP control based on scheduled runtime management and/or current heat energy demand
Level 1
CHP runtime control influenced by the fluctuating availability of RES; overproduction will be fed into the grid
Level 2
CHP runtime control influenced by the fluctuating availability of RES and grid signals; dynamic charging and runtime control to optimise self-consumption of renewables