Smart-ready service C-2a · Cooling
Generator control for cooling
In short
- 1This page covers the regulation of the chiller, a smart-ready service within the cooling domain.
- 2It concerns how well a cooling machine or chiller adjusts its capacity to the demand in the building.
- 3The service has four functionality levels, ranging from simple on/off switching to control that also responds to electricity grid signals.
The levels
Level 0
On/Off-control of cooling production
Level 1
Multi-stage control of cooling production capacity depending on the load or demand (e.g. on/off of several compressors)
Level 2
Variable control of cooling production capacity depending on the load or demand (e.g. hot gas bypass, inverter frequency control)
Level 3
Variable control of cooling production capacity depending on the load AND external signals from grid
What is chiller control?
The chiller is the equipment that produces cooling for a building's air conditioning system, for example a chiller or refrigeration machine. Within the Smart Readiness Indicator (SRI), it is assessed how well this equipment can match its capacity to actual demand. This service falls under code C-2a and is part of the cooling domain.
The service counts towards method A, the simplified assessment method of the SRI. Method A uses a limited selection of smart-ready services to provide a representative estimate of building intelligence.
What functionality levels are there?
The SRI methodology distinguishes four functionality levels for this service, numbered 0 to 3. Each level represents a step in how well cooling production adapts to demand.
- Level 0: on/off control of cooling production, without intermediate steps.
- Level 1: stepped control of production capacity, for example by switching multiple compressors on or off individually.
- Level 2: variable control of production capacity, for example using hot gas bypass or frequency control via an inverter.
- Level 3: variable control that responds not only to the load within the building but also to external electricity grid signals.
Why does this count towards the SRI score?
A chiller that can adjust its capacity continuously typically consumes less energy than a system that only switches on or off. This aligns with the impact criteria of the SRI, which include energy efficiency and the ability to respond to user needs.
Level 3 goes a step further: it links control to signals from outside the building. This matches the impact criterion that examines the ability to adapt to the electricity grid, for example when renewable energy supply varies.