Cooling in care building: what the SRI measures

Cooling mirrors heating: control per room, prevent heating and cooling from fighting each other, store cold when electricity is cheap, and let the chiller follow actual demand.

In short

  1. 1Control of cooling emission, generation and storage.
  2. 2Weight of this domain for this building type: medium.
  3. 3If everything in this domain is at level 0, the domain contributes nothing. At the highest level for all services, the indicative total score for this building type rises by about 16 percentage points (from 30 to 46 percent, with all other domains at level 1).

Weight of this domain for this building type

medium

Which services count

ServiceLowest levelHighest levelAdvice
Cooling emission control
C-1a · A · 5 levels
No automatic controlIndividual room control with communication and occupancy detectionlevel 2 or higher
Emission control for TABS (cooling mode)
C-1b · 4 levels
No automatic controlAdvanced central automatic control with intermittent operation and/or room temperature feedback control
Control of distribution network chilled water temperature (supply or return)
C-1c · 3 levels
Constant temperature controlDemand based control
Control of distribution pumps in networks
C-1d · 5 levels
No automatic controlVariable speed pump control (external demand signal)
Interlock: avoiding simultaneous heating and cooling in the same room
C-1f · 3 levels
No interlockTotal interlock (control system ensures no simultaneous heating and cooling can take place)
Control of Thermal Energy Storage (TES) operation
C-1g · 4 levels
Continuous storage operationCold storage capable of flexible control through grid signals (e.g. DSM)
Generator control for cooling
C-2a · A · 4 levels
On/Off-control of cooling productionVariable control of cooling production capacity depending on the load AND external signals from gridlevel 2 or higher
Sequencing of different cooling generators
C-2b · 5 levels
Priorities only based on running timesSequencing based on dynamic priority list, including external signals from grid
Report information regarding cooling system performance
C-3 · A · 5 levels
NoneCentral or remote reporting of performance evaluation including forecasting and/or benchmarking; also including predictive management and fault detectionlevel 2 or higher
Flexibility and grid interaction
C-4 · A · 5 levels
No automatic controlOptimized control of cooling system based on local predictions and grid signals (e.g. through model predictive control)level 2 or higher

Worked example

If everything in this domain is at level 0, the domain contributes nothing. At the highest level for all services, the indicative total score for this building type rises by about 16 percentage points (from 30 to 46 percent, with all other domains at level 1).

What this means for you

Owner
When replacing or renovating in this domain, include the controls right away. It counts for this building type.
Tenant
Control of cooling emission, generation and storage.
Advisor
10 services in this domain, 4 of which in Method A. Advice for this building type: level 2 or higher.

Next step

Want to know where your building stands?