SR

Smart-ready service MC-29 · Monitoring and control

Override of DSM control

In short

  1. 1This page covers MC-29, a smart-ready service within the Monitoring and control domain of the Smart Readiness Indicator.
  2. 2The service assesses whether users can manually or time-based override a demand-controlled regulation system.
  3. 3There are five functionality levels, ranging from no override capability to time-based override with optimised control.

The levels

  1. Level 0

    No DSM control

  2. Level 1

    DSM control without the possibility to override this control by the building user (occupant or facility manager)

  3. Level 2

    Manual override and reactivation of DSM control by the building user

  4. Level 3

    Scheduled override of DSM control (and reactivation) by the building user

  5. Level 4

    Scheduled override of DSM control and reactivation with optimised control

What is MC-29?

MC-29 is a smart-ready service within the Smart Readiness Indicator (SRI), a European methodology that measures how well a building is prepared for smart technology. This service falls under the Monitoring and control domain.

The service examines demand-controlled regulation: a system that automatically operates technical systems based on current demand for heating or ventilation. MC-29 assesses whether and how a building user, such as an occupant or facilities manager, can override this regulation themselves.

What functionality levels exist?

The SRI defines functionality levels 0 to 4 for each smart-ready service, indicating how advanced a system is. For MC-29, these levels range from no override capability to a fully optimised solution.

  • Level 0: no demand-controlled regulation is present.
  • Level 1: demand-controlled regulation is present, but the user cannot override it.
  • Level 2: the user can manually override the regulation and reactivate it later.
  • Level 3: the user can time-based override the regulation, with automatic reactivation after a set period.
  • Level 4: time-based override works in combination with optimised control.

Higher levels give users more control without compromising the building's energy efficiency.

How does MC-29 count towards the SRI score?

The SRI evaluates each smart-ready service against seven impact criteria, including energy efficiency and comfort. These criteria rest on three key functionalities that carry equal weight: ease of use, information to occupants, and adaptability.

MC-29 counts within the Monitoring and control domain, which together with eight other domains determines the total SRI score. The final result is expressed as a percentage and classified into one of seven classes, from below 20 per cent to 90 to 100 per cent.

Relevant for these building types

Next step

Want to know where your building stands?