Apartment building · Monitoring and control
Monitoring and control in apartment building: what the SRI measures
Monitoring and control is the building's nervous system: the building management system that coordinates installations, detects faults, reports energy use and can respond to occupancy and to grid signals.
In short
- 1The building management system, fault detection and reporting.
- 2Weight of this domain for this building type: medium.
- 3If everything in this domain is at level 0, the domain contributes nothing. At the highest level for all services, the indicative total score for this building type rises by about 20 percentage points (from 26 to 46 percent, with all other domains at level 1).
Weight of this domain for this building type
medium
Which services count
| Service | Lowest level | Highest level | Advice |
|---|---|---|---|
| Run time management of HVAC systems MC-3 · 4 levels | Manual setting | Heating and cooling plant on/off control based on predictive control or grid signals | – |
| Detecting faults of technical building systems and providing support to the diagnosis of these faults MC-4 · 4 levels | No central indication of detected faults and alarms | With central indication of detected faults and alarms for all relevant TBS, including diagnosing functions | – |
| Occupancy detection: connected services MC-9 · 3 levels | None | Centralised occupant detection which feeds in to several TBS such as lighting and heating | – |
| Central reporting of TBS performance and energy use MC-13 · A · 4 levels | None | Central or remote reporting of realtime energy use per energy carrier, combining TBS of all main domains in one interface | level 2 or higher |
| Smart Grid Integration MC-25 · A · 3 levels | None - No harmonization between grid and TBS; building is operated independently from the grid load | Coordinated demand side management of multiple TBS | level 2 or higher |
| Reporting information regarding demand side management performance and operation MC-28 · 3 levels | None | Reporting information on current, historical and predicted DSM status, including managed energy flows | – |
| Override of DSM control MC-29 · 5 levels | No DSM control | Scheduled override of DSM control and reactivation with optimised control | – |
| Single platform that allows automated control & coordination between TBS + optimization of energy flow based on occupancy, weather and grid signals MC-30 · A · 4 levels | None | Single platform that allows automated control & coordination between TBS + optimization of energy flow based on occupancy, weather and grid signals | level 2 or higher |
Worked example
If everything in this domain is at level 0, the domain contributes nothing. At the highest level for all services, the indicative total score for this building type rises by about 20 percentage points (from 26 to 46 percent, with all other domains at level 1).
What this means for you
- Owner
- When replacing or renovating in this domain, include the controls right away. It counts for this building type.
- Tenant
- The building management system, fault detection and reporting.
- Advisor
- 8 services in this domain, 3 of which in Method A. Advice for this building type: level 2 or higher.
Next step