Sequencing of different cooling generators

In short

  1. 1This service has 5 levels, from manual to fully automatic.
  2. 2Priorities only based on running times → Sequencing based on dynamic priority list, including external signals from grid.
  3. 3This service is only part of the full Method B.

The levels

  1. Level 0

    Priorities only based on running times

  2. Level 1

    Fixed sequencing based on loads only: e.g. depending on the generators characteristics such as absorption chiller vs. centrifugal chiller

  3. Level 2

    Dynamic priorities based on generator efficiency and characteristics (e.g. availability of free cooling)

  4. Level 3

    Load prediction based sequencing: the sequence is based on e.g. COP and available power of a device and the predicted required power

  5. Level 4

    Sequencing based on dynamic priority list, including external signals from grid

Relevant for these building types