Smart-ready service MC-25 · Monitoring and control
Smart Grid Integration
In short
- 1This service has 3 levels, from manual to fully automatic.
- 2None - No harmonization between grid and TBS; building is operated independently from the grid load → Coordinated demand side management of multiple TBS.
- 3This service is part of the simplified Method A and therefore counts in the calculator.
The levels
Level 0
None - No harmonization between grid and TBS; building is operated independently from the grid load
Level 1
Demand side management possible for (some) individual TBS, but not coordinated over various domains
Level 2
Coordinated demand side management of multiple TBS
Relevant for these building types