Smart-ready service MC-25 · Monitoring and control

Smart Grid Integration

In short

  1. 1This service has 3 levels, from manual to fully automatic.
  2. 2None - No harmonization between grid and TBS; building is operated independently from the grid load → Coordinated demand side management of multiple TBS.
  3. 3This service is part of the simplified Method A and therefore counts in the calculator.

The levels

  1. Level 0

    None - No harmonization between grid and TBS; building is operated independently from the grid load

  2. Level 1

    Demand side management possible for (some) individual TBS, but not coordinated over various domains

  3. Level 2

    Coordinated demand side management of multiple TBS